Project Type: Plan/Spec
Industry: Primary Education
Project Description:
Replacement of an aging unit that servers the gymnasium. The existing unit and rooftop ductwork was removed and replaced with a new high efficiency energy recovery unit. The new duct work installed on the roof was insulated with prefabricated fabricated sections and installed with a weather proof coating. Upgrades to the buildings direct digital control system was also part of this project.